首页 诗词 字典 板报 句子 名言 友答 励志 学校 网站地图
当前位置: 首页 > 财会考试 > ACCA/CAT > ACCA备考 >

ACCA考试《F5业绩管理》复习笔记二十一(2)

2013-02-07 

  This information suggests three different ways of apportioning costs:

  Basis / driverUnitProduction hoursBatches

  Driver volume8,0002,5008

  OAR$5 per unit$16 per hour%5,000 per batch

  Overheads to X2,000×5=$10,0001,000×16=$16,0005×5,000=25,000

  Overheads to Y6,000×5=$30,0001,500×16=$24,0003×5,000=15,000

  The selection of the cost driver can therefore make a significant difference.


热点排行